Project Links
Point Reyes National Seashore » Drakes Bay Oyster Company Special Use Permit Environmental Impact Statement » Document List » Document Contents
Public Scoping Letter and scoping materials
The documents below were put together for public scoping.
The letter contains the purpose of and need for action and objectives of the plan. The letter also includes information on how to comment and the dates, times, and locations of public meetings associated with the scoping effort.
The Notice of Intent was published in the Federal Register on October 22, 2010.
The public meeting posters and public meeting handout are also included as separate files below.
Comment Period:
Closed
Oct 8, 2010 - Nov 26, 2010
|
Document Content: |
Public Scoping Posters
(835.2 KB, PDF file)
Scoping letter
(31.2 KB, PDF file)
Notice of Intent
(46.5 KB, PDF file)
Public Scoping meeting handout
(460.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |