National Park Service Logo
PEPC Planning, Environment & Public Comment
PEPC Home Documents by Park Policy/Links Park Planning Search Documents

Rehabilitation of Hurricane Ridge Road Environmental Assessment

The EA analyzes the effects of rehabilitating and resurfacing 17.6 miles of the Hurricane Ridge Road, from its intersection with the Mt. Angeles Road in Port Angeles to the Hurricane Ridge Visitor Center.
 
Comment Period: Closed        10/04/2004 - 11/05/2004
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.