PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Signed FONSI for BP Proposal to Directionally Drill and Produce up to 9 Wells from 6 Surface Locations Outside BITHs Neches BottomJack Gore Baygall


Signed FONSI for BP Proposal to Directionally Drill and Produce up to 9 Wells from 6 Surface Locations Outside BITHs Neches BottomJack Gore Baygall
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.