PEPC and Parkplanning will be offline Weds. December 11th starting at 7:00 AM MT for scheduled maintenance. Expected downtime is up to four hours.

Environmental Assessment of the Famcor Proposal to Directionally Drill and Produce the Carroll-BMSC#2 and #3 Wells from a New Surface Location Outside Big Sandy Creek Unit and the Carroll-BSMC #1 and #5 Wells and the Carroll #4 Well From an Existing Surface Location Outside the Big Sandy Creek Unit


Environmental Assessment of the Famcor Oil Inc Proposal to Directionally Drill and Produce the Carroll-BMSC#2 and #3 Wells from a New Surface Location Outside Big Sandy Creek Unit and the Carroll-BSMC #1 and #5 Wells and the Carroll #4 Well From an Existing Surface Location Outside the Big Sandy Creek Unit
 
Comment Period: Closed        May 21, 2013 - Jun 22, 2013
Document Content:
Environmental Assessment   (27.7 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.