Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Redesign of Landscape at Lake Mead NRA Headquarters


Project description with photos and drawings
 
Comment Period: Closed        Jul 13, 2015 - Aug 13, 2015
Document Content:
HQ Landscaping Project Description.docxHQ Landscaping Project Description.docx   (14.5 KB, .docx file)
Photo 1.jpgPhoto 1.jpg   (95.1 KB, Image file)
Photo 2.jpgPhoto 2.jpg   (69.7 KB, Image file)
Photo 3.jpgPhoto 3.jpg   (438.0 KB, Image file)
Photo 4.jpgPhoto 4.jpg   (409.9 KB, Image file)
Drawing 1 Existing Landscape.pdfDrawing 1 Existing Landscape.pdf   (175.5 KB, PDF file)
Drawing 2 Proposed Tree Layout.pdfDrawing 2 Proposed Tree Layout.pdf   (188.1 KB, PDF file)
Drawing 3 Proposed Groundscape.pdfDrawing 3 Proposed Groundscape.pdf   (547.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.