PEPC and Parkplanning.nps.gov will be offline for maintenance on Tuesday, Sept. 28 starting at 7:00 AM Mtn. Time. Expected downtime is up to 60 minutes. Please save your work before this time.
Spirit Mountain

Draft Wilderness Management Plan

Draft Wilderness Plan for Jimbilnan, Pinto Valley, Black Canyon, Eldorado, Ireteba Peaks, Nellis Wash, Spirit Mountain and Bridge Canyon Wilderness Areas
 
Comment Period: Closed        01/14/2014 - 03/23/2014
Document Content:
LAKE_MEAD_DRAFT_WMP-EIS_reduced.pdfLAKE_MEAD_DRAFT_WMP-EIS_reduced.pdf   (18.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.