National Park Service Logo
PEPC Planning, Environment & Public Comment
PEPC Home Documents by Park Policy/Links Park Planning Search Documents

Fish Barrier EA

Fish Barrier EA for public review
 
Comment Period: Closed        03/15/2013 - 04/20/2013
Document Content:
Fish Barrier EAFish Barrier EA   (2.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.