National Park Service Logo
PEPC Planning, Environment & Public Comment
PEPC Home Documents by Park Policy/Links Park Planning Search Documents
Historic black and white photo of the Muir Woods entrance with text handwritten on the bottom left corner reading "Gateway to Muir Woods, Marin Co., Calif.". Photo provided by Golden Gate NRA, Park Archives, Muir Woods Collections, GOGA 32470.

Final EA/FONSI/Determination of No Impairment

A Final EA and Finding of No Significant Impact (FONSI) for the Muir Woods Water/Wastewater Service Rehabilitation project has been completed in accordance with the National Environmental Protection Act (NEPA). The FONSI describes the rationale used in selecting the alternative for implementation and provides an explanation of why it will have no significant effects on the human environment. Included in these documents is a "NPS Response to Comments" for comments received on the Draft Environmental Assessment. These documents can be downloaded using the links below. Construction is anticipated to begin in June 2018.
 
Document Content:
Final EA and FONSI.pdfFinal EA and FONSI.pdf   (13.1 MB, PDF file)
FONSI.pdfFONSI.pdf   (5.5 MB, PDF file)
Determination of No Impairment.pdfDetermination of No Impairment.pdf   (321.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note:Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.