Muir Woods Reservation System Finding of No Significant Impact (FONSI) and Errata


The Muir Woods National Monument Reservation System Environmental Assessment (EA) has completed National Environmental Policy Act (NEPA) compliance to implement a parking and shuttle reservation system for Muir Woods National Monument. Acting Pacific West Regional Director Martha Lee approved the Finding of No Significant Impact (FONSI) on December 23, 2015. The NPS has prepared an Errata to the EA for minor clarifications and corrections and a Response to Public Comments. A Determination of No Impairment (DNI) has also been prepared as an attachment to the FONSI/EA. These documents can be found at the links below. This FONSI, DNI, EA, and Errata comprise the complete record of environmental impact analysis for the project for the NPS.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.