Transportation and Circulation Study - Report Only


This report contains the results of a transportation impact analysis conducted for the Alcatraz Ferry Embarkation Environmental Impact Statement (EIS). The report describes the three action alternatives, including one at Pier 31½ on the Embarcadero, one at Pier 41 near Fisherman's Wharf, and one in Lower Fort Mason, and one project component common to all alternatives, a new service to Fort Baker. For the Lower Fort Mason alternative, three scenarios were considered: one in which the current transit system is largely kept intact, one in which the F Market & Wharves historic streetcar is extended to the site, and one in which a shuttle is implemented operating between Fisherman's Wharf and Lower Fort Mason.

The report describes the travel demand associated with each of the alternatives, and how the various alternatives would affect traffic, transit capacity, parking, and bicycle and pedestrian circulation. The analysis identifies that the various alternatives would have significant impacts to the transportation network that require mitigation.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.