Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Aerial photograph of existing embarkation facility at Pier 31-1/2

Public Scoping Comment Summary


This Public Scoping Comment Summary presents a summary of the comments received during the public scoping period, June 1, 2012 through July 31, 2012, for the Alcatraz Ferry Embarkation EIS. While not all comments received during public scoping are included in this report, all comments will be considered by NPS in preparation of the EIS.
 
Document Content:
Public Scoping Comment SummaryPublic Scoping Comment Summary   (124.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.