Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Aerial image of Vista Point Trail Project area and vicinity.

Vista Point Multi-Use Trail Draft CE


Enclosed is the Draft Categorical Exclusion (CE) for the Vista Point Multi-Use Trail. Herein is the project description, environmental impacts analysis, best management practices, and the preliminary design drawings for the Project.
 
Comment Period: Closed        May 4, 2016 - Jun 4, 2016
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.