Vista Grande Drainage Basin Improvement Project EIS Record of Decision


The Department of the Interior, National Park Service (NPS), has prepared this Record of Decision on the Final Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the Vista Grande Drainage Basin Improvement Project at Fort Funston in San Francisco, California. This document includes a description of the background for the project, a statement of the decision made, a synopsis of other alternatives considered, a description of the environmentally preferable alternative, the basis for the decision, an appendix detailing measures to minimize environmental harm (Attachment 1), and an overview of public involvement and agency consultation in the decision-making process. Also attached is the Determination of No Impairment.

The Record of Decision (ROD) documents below includes the following content:

- Record of Decision
- Attachment 1: Mitigation Monitoring and Reporting Program
- Determination of No Impairment
- Photo 1: Vista Grande Tunnel Alignment
- Photo 2: Before & After Beach Outfall

You can find the ROD and DNI available for download below.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.