Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Draft Engineering Evaluation/Cost Analysis (EE/CA) - February 14, 2014


ECM has prepared a Draft Engineering Evaluation/Cost Analysis (EE/CA). The EE/CA describes the environmental characterization work performed in 2013 and proposes four alternatives for non-critical removal actions for the lead-impacted soil. The public is invited to review and comment on this document. The 30-day public review and comment period will be open from February 14, 2014 through March 16, 2014.

The EE/CA is available in the public repository at the Mammoth Lakes Library. It is also available here, and is also incorporated under the Administrative Record File with other relevant site documents.
 
Comment Period: Closed        Feb 14, 2014 - Mar 14, 2014
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.