Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
View of New River Gorge from Diamond Point.

Final General Management Plan / Final Foundation Plan


The Final General Management Plan is a condensed tabletop document which provides a Park Overview, summarizes the Foundation for Planning, describes the planning and consultation processes, and focuses on a comprehensive description of the Preferred Alternative that was selected for implementation. The final also incorporates the revisions and corrections to the Draft GMP/EIS identified in the Abbreviated Final GMP/EIS and Foundation Plan.

The Final Foundation Plan describes the Park Purpose and Significance, identifies the Fundamental and Other Important Resources and Values, and provides the complete Analysis of Fundamental and Other Resoruces and Values. The final also incorporates the revisions and corrections to the Draft Foundation Plan identified in the Abbreviated Final GMP/EIS and Foundation Plan.

The General Management Plan has been divided into four files to enable easier downloading. The four GMP files and the Foundation Plan are all less than 10 Mb in size.

 
Document Content:
NERI Foundation Plan Web.pdfNERI Foundation Plan Web.pdf   (8.3 MB, PDF file)
NERI GMP Web Part 1.pdfNERI GMP Web Part 1.pdf   (9.0 MB, PDF file)
NERI GMP Web Part 2.pdfNERI GMP Web Part 2.pdf   (3.8 MB, PDF file)
NERI GMP Web Part 3.pdfNERI GMP Web Part 3.pdf   (8.2 MB, PDF file)
NERI GMP Web Part 4.pdfNERI GMP Web Part 4.pdf   (4.7 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.