Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Aerial view of the 0.26 mile Arches Visitor Center Connector Trail taken from the Moab Fault Overlook along the park scenic drive.

Written Determination: Bicycle Use on Visitor Center Connector Trail at Arches National Park


Prior to designating an existing trail in a developed area for bicycle use, NPS regulations at 36 CFR 4.30 require a written determination that such use is consistent with the protection of the Park's natural, scenic, and aesthetic values, safety considerations and management objectives, and will not disturb wildlife or Park resources.
 
Comment Period: Closed        Jan 21, 2021 - Feb 22, 2021
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.