Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Photograph of south facade of the Second Bank of the United States and adjacent paving

Morris Arboretum Consultants Report


The park sought expert advice on alternative approaches to addressing issues caused by the expanding roots of the London planetrees that line the east and west sides of the Second Bank of the United States. This document is the letter report submitted to the park's civil engineering consultant, Hunt engineering Company, by Jason Lubar, Associate Director of Urban Forestry, Morris Arboretum. The report is in PDF format (624 KB).

You may send us any comments you might have on this document by accessing the Summary Project Description document during the open comment period and entering your comments there. You may also send them by email or postal mail to the addresses listed under "Contact Information" on the home page for this project.
 
Document Content:
Morris Arboretum Consultants Report.pdfMorris Arboretum Consultants Report.pdf   (623.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.