Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Human Use and Ecological Impacts Associated with the Proposed Susquehanna to Roseland Transmission Line


The Susquehanna to Roseland 500-kilovolt (kV) Transmission Line Right-of-Way and Special Use Permit Final Environmental Impact Statement (FEIS) describes impacts within three units of the national park system of constructing a double 500-kV transmission line (S-R Line). The National Park Service (NPS) has identified alternative 2 as the preferred alternative in the FEIS. This report describes analyses conducted to estimate human use and ecological losses in monetary terms resulting from alternative 2 using established approaches commonly applied in regulatory analysis and natural resource damage assessment.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.