Marconi Area Facilities Improvements


This Environmental Assessment (EA) addresses a proposal of the National Park Service (NPS) to conduct four facility construction improvements in and near the Marconi Headquarters and Maintenance facilities in South Wellfleet, MA (commonly known as the Marconi Area). The purposes of these projects are to improve employee and visitor safety, contribute to regional transportation goals, produce a more efficient work place, and to enhance emergency response capabilities. These projects are being considered in a single EA to facilitate an integrated assessment of effects to the Marconi Area.

These four projects--Helipad Improvement, Waterline and Hydrant Extension, Transit Shelter Construction, and Fire Cache Construction-- are being considered within a single Environmental Assessment to facilitate integrated assessment of impacts to the Marconi Area, and public consultation on the projects. There are impacts to broom crowberry to consider together, and a proposed mitigation plan. There is an anticipated timetable for the completion of all four projects within two years.
 
Comment Period: Closed        May 15, 2008 - Jun 14, 2008
Document Content:
Marconi Area Facilities Improvements   (1.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.