Public Notice: Archeological Plan for Transportation and Information Hub at Faneuil Hall


Due to the potential for adverse effects to archeological resources during excavations for a second means of egress from the basement level, the NPS entered into a memorandum of agreement (MOA) with the Massachusetts State Historic Preservation Officer (SHPO), the Boston Landmarks Commission (BLC), and the City of Boston Archeologist. The MOA stipulates that the NPS shall have a qualified archeological research team develop an archeological data recovery plan for the recovery of significant information from excavations done during construction. The archeological field excavations performed according to the archeological data recovery plan will be conducted prior to construction. This public notice describes the project and potential impacts.
 
Comment Period: Closed        Aug 3, 2010 - Sep 2, 2010
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.