Project Links
Wrangell-St. Elias National Park & Preserve » Little Eldorado and Bonanza Creek (updated) Claim Groups Mining Plan of Operations, Gold Hill EA (Chisana, LLC.) » Document List » Document Contents
Bonanza and Little El Mining Plan of Operations Environmental Assessment
National Park Service has prepared this Environmental Assessment (EA) to analyze the effects of proposed suction dredge mining on the Bonanza and Little El unpatented claims in the Gold Hill area of Wrangell St. Elias National Park and Preserve. The EA is available for public review and comment.
Also included are Appendices A - E.
Comment Period:
Closed
Jun 13, 2016 - Jul 8, 2016
|
Document Content: |
APPENDIX E Floodplains SOF.pdf
(261.9 KB, PDF file)
APPENDIX_C_810_Bonanza LittleL.pdf
(133.2 KB, PDF file)
App A MPO Little El and Bonanza.pdf
(2.2 MB, PDF file)
WRSTLittleElBonanzadraftEA.pdf
(1.1 MB, PDF file)
APPENDIX D stipulations.pdf
(93.8 KB, PDF file)
Appendix B RWCA.pdf
(20.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |