Project Links
Wrangell-St. Elias National Park & Preserve » Gold Run Mining Plan of Operations (Fiehler) » Document List » Document Contents
Appendix C: ANILCA 810 analysis for Gold Run MPO
This document discusses the proposed project's potential effects on subsistence, as required by the Alaska National Interest Lands Conservation Act (ANILCA).
Comment Period:
Closed
Apr 17, 2017 - May 18, 2017
|
Document Content: |
APPENDIX_C_810_GoldRunMPO.pdf
(135.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |