Project Links
Wrangell-St. Elias National Park & Preserve » Gold Run Mining Plan of Operations (Fiehler) » Document List » Document Contents
Public review EA for the Gold Run Mining Plan of Operations
This Environmental Assessment (EA) describes two alternatives: 1) The No Action alternative, where NPS would not authorize mining operations on the Gold Run unpatented claims; and 2) NPS would authorize mining on the Gold Run claims consistent with the Mining Plan of Operations and NPS stipulations (this is the NPS preferred alternative). The EA analyzes the environmental effects resulting from each alternative. Also included for public review and comment are Appendices A, C, D, and E. There is no Appendix B.
Comment Period:
Closed
Apr 17, 2017 - May 18, 2017
|
Document Content: |
Gold Run public review version EA.pdf
(1.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |