EA Scoping Report


1). Report on PEPC Comments 3-12-11 to 4-22-11

2). Report of the comments received for the President's Park South Project, from March 8th to April 22, 2011.

3). Report of the comments received for the President's Park South Project, on the ALTERNATIVES - Public Comments in PEPC as of September 12, 2013



 
Document Content:
PEPC Comments 3-12-11 to 4-22-11.pdf   (1.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.