Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

2009 Chesapeake and Ohio Canal NHP Fire Management Plan


Attached is the approved park fire management plan. This plan outlines procedures for emergency wildland fire actions. It also specifies that restoration work (post-fire) and prescribed burn activities will require additional compliance review.
 
Document Content:
Signature Cover PageSignature Cover Page   (320.8 KB, PDF file)
Pages 28-57Pages 28-57   (1.5 MB, PDF file)
Appendices A - CAppendices A - C   (3.2 MB, PDF file)
Appendices D-HAppendices D-H   (4.9 MB, PDF file)
Appendix IAppendix I   (3.4 MB, PDF file)
Appendix JAppendix J   (5.4 MB, PDF file)
Appendix KAppendix K   (6.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.