Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Purple Line ROD (NPS FTA)


Purple Line Project environmental decision documents.
 
Document Content:
Purple Line ROD NPSPurple Line ROD NPS   (4.9 MB, PDF file)
Purple Line ROD FTAPurple Line ROD FTA   (176.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.