Port Oneida Historic Landscape Management Plan/EA


The National Park Service (NPS) at Sleeping Bear Dunes National Lakeshore (National Lakeshore) has prepared an Environmental Assessment (EA) that provides alternatives for addressing historic landscape management activities in the Port Oneida Rural Historic District (Port Oneida). The Port Oneida Historic Landscape Management Plan/EA proposes desired future resource conditions for the Port Oneida landscape and an array of historic landscape management treatments. Implementation of these historic landscape management treatments would result in meeting the desired future resource conditions for Port Oneida.

We would like your opinion on the best way to manage the historic landscape at Port Oneida. The National Lakeshore encourages you to comment on the EA until the public comment period closes on September 12, 2011.

A public open house on the project is scheduled for Tuesday, August 23, from 5:00 p.m. to 7:00 p.m. at the Philip A. Hart Visitor Center auditorium in Empire. A 30-minute presentation on the EA will be held at 5:30 p.m., with a question and answer period following. Comments may also be submitted in writing at the open house.
 
Comment Period: Closed        Aug 9, 2011 - Sep 12, 2011
Document Content:
Part 1: EA Cover to Field 2 Map   (3.7 MB, PDF file)
Part 2: Field 3 Map to Field 9 Map   (3.3 MB, PDF file)
Part 3: Field 10 Map to Field 15 Map   (3.3 MB, PDF file)
Part 4: Field A-6 Map to End   (3.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.