Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Photo of a wooded area with green summer foliage and sun-dappled light illuminating the forest floor.

Cable Connector Trail Bike Rule - Final Rule


The regulation that allows bicycles on the Cable Connector Trail. This rule was published in the federal register on February 17, 2022 and will be effective on March 21, 2022.

Document number: 2022-03394
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.