Categorical Exclusion for Alley Spring Sewer System Rehabilitation


The Alley Spring sewer collection system is being repaired and rehabilitated to bring it back to safe operating conditions. After inspections that included video monitoring equipment, components of the system have been identified for work. The work will be the replacement of existing components in the same footprint. This system was reviewed under the Park's GMP/DCP of 1981.
 