Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Categorical Exclusion for Akers- Install Metal Gate


Proposal to install a metal pipe gate to close access to the mouth of Gladden Creek, downstream from Akers Ferry, to all but Service Personnel. Once installed, the gate will deter public access to bottomland floodplain lying within the flash flood zone.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.