Project Links
Indiana Dunes National Park » Construction of Marquette Greenway Trail - Calumet Segment » Document List » Document Contents
Marquette Greenway Trail - Calumet Reroute Segment - Environmental Assessment
The National Park Service has issued a Finding of No Significant Impact (FONSI), and Alternative B - Build the Trail was the selected alternative. This alternative best meets the project purpose and need, which is to provide ABA/ADA connectivity and transportation throughout the Park and to adjacent communities with an East-West trail connecting the entire length of the Park, connecting the Park to the regional Marquette Greenway Trail thus allowing for regional access to the Park from as far away as Chicago, providing non-motorized methods of getting into the Park in order to reduce car and parking congestion, and to promote green and healthy ways of getting to and enjoying the Park.
Document Content: |
Marquette Greenway Trail - Calumet Reroute Segment WSOF.pdf
(627.4 KB, PDF file)
Appendix A - Maps and Figures 2023-08-31.pdf
(11.6 MB, PDF file)
Marquette Greenway Trail - Calumet Reroute Segment EA.pdf
(1.3 MB, PDF file)
Marquette Greenway Trail - Calumet Reroute Segment FONSI DONI.pdf
(432.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |