PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Revised EA and FONSI


Finding of No-Significant Impact (FONSI) and Revised Environmental Assessment (EA) for the Olga Lake Right-of-Way Certificate of Access project.
 
Document Content:
20190708_FONSI_OlgaLakeRWCA.pdf   (689.5 KB, PDF file)
20190626_EA_KATM-RWCA_Revised.pdf   (2.5 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.