Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Erbie Road Improvements Environmental Assessment


The National Park Service (NPS), in cooperation with the Federal Highway Administration (FHWA), proposes to rehabilitate a 2.58-mile damaged section of Compton-Erbie Road (County Road 19) and to replace two low-water crossings in the Erbie area. All of the proposed work lies within the Buffalo National River (park), in Newton County, Arkansas. In May of 2015, a major storm event caused widespread damage in the park. Along with repair of the storm damage, improvements are necessary to reduce the likelihood of damage from future storm events. This Environmental Assessment (EA) examines two alternatives; the No Action Alternative and the Action Alternative.
 
Comment Period: Closed        Apr 16, 2018 - May 15, 2018
Document Content:
BUFF Erbie EA BUFF Erbie EA   (4.5 MB, PDF file)
BUFF Erbie EA Appendix ABUFF Erbie EA Appendix A   (25.3 KB, PDF file)
BUFF Erbie EA Appendix B BUFF Erbie EA Appendix B   (3.1 MB, PDF file)
BUFF Erbie EA Appendix C BUFF Erbie EA Appendix C   (175.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.