Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

BADL, Comments received for Newsletter #1


During the comment period following the release of newsletter #1 in the spring of 2008, the GMP team received comments from public meetings, mailings, and on the PEPC and park websites. These comments have been recorded in the documents listed below and are available for public review on this site and the park website. The GMP team is now in the process of developing a range of alternatives based in large part on these comments, and a preferred alternative. Please check this site and/or the park website periodically for updates.
1. Summary of comments received. This document broadly describes the nature of the comments received.
2. Matrix with all comments from all sources presented in five general classifications.
3. Comments from mailings and website postings that correspond to the questions on the comment card contained in the newsletter.
 
Document Content:
Summary of commentsSummary of comments   (71.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.