Project Links
Yellowstone National Park » Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas » Document List » Document Contents
Determination of Effect Documents for Section 106
These documents serve to help in the determination of effect for Section 106 of the National Historic Preservation Act.
Comment Period:
Closed
May 19, 2017 - Jun 22, 2017
|
Document Content: |
Copy of WY1 Mount Washburn photo sims C-tower 060315.pdf
(3.8 MB, PDF file)
Washburn Verizon 100 Percent Simulation 2016 (1)1.pdf
(1.6 MB, PDF file)
Map1MountWashburnTelecommunicationsUpgrade.pdf
(1.2 MB, PDF file)
Copy of VZW_WY1 Mount Washburn 90_ ZD REV B_2015_06_03 (1)1.pdf
(1.8 MB, PDF file)
SHPO Adverse Effect Determination.pdf
(91.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems. |