Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Photo simulation view from Grand Loop Road, looking toward a proposed cellular site and showing an associated tower.

Categorical Exclusion - Signed


This is a copy of the signed categorical exclusion that was prepared to address minor changes to the 2008 Wireless Services Communications Plan in regards to the Lake Cellular Site.
 
Document Content:
Categorical Exclusion - SignedCategorical Exclusion - Signed   (1.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.