Photo simulation view from Grand Loop Road, looking toward a proposed cellular site and showing an associated tower.

SHPO Letter - Data Cable


This letter from the WY SHPO concurs "no historic properties affected" for installation of a data cable. Trenching for the data cable was not discussed in the Wireless Communications Plan/EA. This data cable will be located directly beneath or directly adjacent to an existing road in the administrative area. There will be no wetlands, archeological sites, or rare plant sites impacted by the installation of this cable.
 
Document Content:
SHPO Letter - Data CableSHPO Letter - Data Cable   (397.1 KB, PDF file)