Project Links
Everglades National Park » Tamiami Trail Modifications: Next Steps Project/EIS » Document List » Document Contents
Memo to File_Turbidity Monitoring for Construction of Tamiami Trail 2.6 mile Bridge Project_May 25, 2017
May 25, 2017 Memo to File authorizing the use of drones instead of airboats to carry out turbidity monitoring required for construction of the Tamiami Trail Next Step Phase 1 bridges.
Document Content: |
20170525_EVER_Tamiami_MTF_Turbidity monitoring.pdf
(268.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |