PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Memo to File_Turbidity Monitoring for Construction of Tamiami Trail 2.6 mile Bridge Project_May 25, 2017


May 25, 2017 Memo to File authorizing the use of drones instead of airboats to carry out turbidity monitoring required for construction of the Tamiami Trail Next Step Phase 1 bridges.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.