Project Links
Bryce Canyon National Park » State Route 12 Stabilization and Expansion » Document List » Document Contents
FONSI for SR-12 Stabilization and Expansion EA
The National Park Service (NPS) and Utah Department of Transportation (UDOT) were co-leads for the environmental assessment process to improve safety and mobility on State Route 12 in Bryce Canyon National Park (BRCA) between mileposts 14.42-18.16. The Finding of No Significant Impact for this project was signed by the Intermountain Regional Director on September 18, 2019. UDOT will be implementing the selected alternative in coordination with the NPS. The project is anticipated to begin next spring. The park will ensure the public is kept informed as this project unfolds. This project is intended to benefit visitors to Bryce Canyon National Park and the surrounding public lands as well as the local communities.
Document Content: |
FINAL SR-12 EA FONSI Packet_508 Compliant (1).pdf
(7.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |