PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Wetlands Statement of Findings


A Wetlands Statement of Findings (WSOF) was prepared by Georgia Power Company (GPC) for the replacement of seven transmission structures within the boundary of Fort Pulaski National Monument at the Bull River and Lazaretto Creek crossings. In the WSOF, several alternatives were analyzed, and Alternative B, Wetland Minimization, was identified as the Preferred Alternative. This WSOF was prepared to provide the analysis regarding the reasonable and feasible alternatives and their impacts to wetlands.
 
Comment Period: Closed        Jul 22, 2019 - Aug 21, 2019
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.