FONSI Issuance of Right-of-Way and Installation of 5.2 mi Electrical Line


FONSI and DNI for project signed May 28, 2019.
 
Document Content:
SCE Phase II FONSI PEPC-69927.pdf   (1.7 MB, PDF file)
SCERight of Way-DNI.pdf   (2.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.