Proposed Installation of New Electric Line and Replacement of the Telephone Line to Kelly's Camp

A project is proposed to extend electric and replace the telephone line to the Kelly's Camp community, following the 2018 Howe Fire. The utilities would be located within the existing North McDonald Road corridor. Normally projects like this fall under a categorical exclusion (CE), which covers routine actions that have little to no potential for environmental impacts and no potential for significant adverse impacts. While public involvement is not typical for projects covered under CE's, the park is providing public review given the local interest. Comments are due April 1, 2019.
 
Comment Period: Closed        03/15/2019 - 04/01/2019
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note:Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.