Project Links
Big South Fork National River and Recreation Area » BISO Contaminated Mine Drainage Mitigation and Treatment System EIS » Document List » Document Contents
Big South Fork NRRA Final Contaminated Mine Drainage Mitigation and Treatment Programmatic and Site Specific Environmental Impact Statement
This is the Big South Fork NRRA Final Contaminated Mine Drainage Mitigation and Treatment Programmatic and Site Specific Environmental Impact Statement. The 30-day no action period will begin with the publication of the EPA's Notice of Availability in the Federal Register on December 14, 2018 and end on January 22, 2018.
Document Content: |
BISO CMD Final EIS 12-10-18_Reduced Size.pdf
(16.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |