Project Links
Nez Perce National Historical Park » Accesibility Self-Evaluation and Transition Plan Review and Comment. » Document List » Document Contents
Whitman Mission National Historic Site Accessibility Self Evaluation and Transition Plan
Draft Accessibility Self Evaluation and Transition Plan for Whitman Mission National Historic Site.
Comment Period:
Closed
Aug 17, 2018 - Oct 26, 2018
|
Document Content: |
WHMI_DRAFT_SETP_OV.5.15.18.pdf
(1.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |