PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Septic System Installation


Effigy Mounds National Monument is proposing to install a new septic system at its headquarters area to serve the Visitor Center. The proposed construction is needed to address a failed system currently in place and serving the Visitor Center.
 
Comment Period: Closed        Feb 16, 2018 - Mar 18, 2018
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.