Project Links
Glen Canyon National Recreation Area » 2002 Antelope Point Marina Resort Development Plan Environmental Assessment » Document List » Document Contents
Antelope Point Marina and Resort Develoment Project FONSI
The Antelope Point Marina and Resort Development Project Environmental Assessment preferred alternative (Alternative C) was selected and resulted in a Finding of No Significant Impact (FONSI) decision document.
Document Content: |
Antelope Point Final FONSI 20020715.PDF
(2.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |