Revisied Reroutes & Repairs to Flood Damaged Trails EA


Based on public comments and input from the Rocky Mountain National Park Leadership Team, the EA has been revised. Revisions were made to the alternatives descriptions for the Aspen Brook and Twin Sisters Trails. A total of four (4) paragraphs have been changed. No other changes have been made to the EA.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.