Final Summary Newsletter and Handout for Eagle Mountain Boundary Study


The NPS has also prepared a summary newsletter of the final recommendations (Newsletter 3). This newsletter summarizes the final study findings, describes the selected alternative, and provides information on the proposed withdrawal application.

The Selected Alternative Summary and Map provides detail specific to the NPS selected alternative.
 
Document Content:
JOTREM_Handout_12_9_16_FINAL.pdf   (2.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.