PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Drawings and Photos, Proposed Oakley Kitchen-Rehabilitation


measured drawings, photos, and site plans for proposed project
 
Comment Period: Closed        Mar 23, 2016 - Apr 24, 2016
Document Content:
Oakley kitchen photos.pdf   (556.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.