PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

NPS Climate Change and Natural Hazards Checklist


This document was developed for this project in response to NPS Policy Memorandum 15-01. It provides guidance in considering relevant conditions and factors attributable to climate change and natural hazards thsat could affact the design and operation of facilities in national parks. Design, engineering and materials for this project takes into account the necessary factors.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.